project name | jiangsu century edge wedding art center | project introduction | p2. 5 ordinary brush, 35 long, 43 high, screen resolution 4480 * 2240, semicircular |
---|---|---|---|
project date | 2020.03 | equipment used | kls24,g612c*131 |
project location | jiangsu | project requirements | 1. the screen of the project is semicircular, and the transmitted image is required to be clear without frame loss and flicker. 2. the camera has no scanning line, and the overall equipment is stable, which perfectly meets the project needs of the user. |
view all cases
-
national phosphorus resources development and utilization engineering technology research center
project name:national phosphorus resources development and utilization engineering technology research center
project date:2021.03
project location:yunnan
project introduction:1. a horn cylindrical screen in the exhibition hall of the research center
-
guizhou liuzhi project
project name:guizhou liuzhi project
project date:2019.12
project location:guizhou
project introduction:p4 arch screen, each arch is 128 points wide and 3286 points long, forming an arch tunnel.
-
guangzhou biological island exhibition hall
project name:guangzhou biological island exhibition hall
project date:2020.07
project location:guangzhou
project introduction:immersive project, wall resolution 4864*1408, left and right secondary resolution 1024*1408, ground resolution 4864*1024
-
jiahong revitalization center
project name:jiahong revitalization center
project date:2021.08
project location:dongguan city, guangdong province
project introduction:1. the three screens display different images respectively 2 p1. 58 small spacing screen
-
baishi golden valley exhibition hall naked eye 3d
project name:baishi golden valley exhibition hall naked eye 3d
project date:2021.03
project location:beijing
project introduction:1. through the way of modeling screen (left, middle, right and bottom, four screens), 2 through the division and reorganization function of f2 server, the video is corresponding to four screens one by one to make 3d effect.
-
memorial hall of the fourth national congress of the communist party of china
project name:memorial hall of the fourth national congress of the communist party of china
project date:2021.05
project location:shanghai
project introduction:1. two screens are used in the project, and specific materials are played point-to-point, clear and undamaged. the cassida control system ensures the perfect effect of the exhibition hall.
-
shangjin ancient city, shiyan, hubei
project name:shangjin ancient city, shiyan, hubei
project date:2021.07
project location:shiyan city, hubei province
project introduction:550 ㎡ tunnel screen with a resolution of 20864 * 2944
-
zhejiang shengqi technology exhibition hall co., ltd
project name:zhejiang shengqi technology exhibition hall co., ltd
project date:2021.08
project location:hangzhou city, zhejiang province
project introduction:four displays of different sizes
-
gansu baiyin cultural and creative center
project name:gansu baiyin cultural and creative center
project date:2020.12
project location:baiyin city, gansu province
project introduction:1. 12 column screens and one sky screen; 2. one tunnel screen; 3. a three fold display strip screen.